• magnetosphere@fedia.io
      link
      fedilink
      arrow-up
      2
      ·
      3 months ago

      That bridge is for a train track. Raising it would be a large, expensive, time consuming project. If you’re changing the grade of a train track, it will need to be long, gradual, and smooth.