Thank you… Anyone who had the case of the Hyatt Regency walkway collapse drilled into their heads in school recognizes the potential for shear force to fuck this column up.
Also this. Basically, TXDOT orders review of the new Corpus Christi bay bridge after a campus bridge built by the contractors failed. Review found the pylon supports insufficient, but they also found the triangle frame connecting the box frames with cables would merc those cables with almost any sheer force. I believe changes were made, have new contractor and project is moving forward as of late last year.
Thank you… Anyone who had the case of the Hyatt Regency walkway collapse drilled into their heads in school recognizes the potential for shear force to fuck this column up.
I feel like all you need to recognize that this is not okay is to not have a traumatic brain injury with a side dish of lazy fuckhead
Yeah, but it’s pretty clear as to why it’s not OK when you understand shear force.
Also this. Basically, TXDOT orders review of the new Corpus Christi bay bridge after a campus bridge built by the contractors failed. Review found the pylon supports insufficient, but they also found the triangle frame connecting the box frames with cables would merc those cables with almost any sheer force. I believe changes were made, have new contractor and project is moving forward as of late last year.